Diffrence between PLC and DCS

 


The traditional system, monitoring processes across multiple locations, involved the collection of data to a single location. This is what SCADA does, basically the "DA(data acquisition)" portion of SCADA. Some control was usually present but not a significant amount. The modern "DCS", or distributed control system, could be described by taking each word of the acronym out and explaining it. 

First, Distributed implies that the functions are all distributed at various locations. These functions refer to the data collection, processing, controlling outputs, alarming, collecting historical data, etc. In a typical DCS system, you will find physical boxes that handle each of the above functions (well, almost). There is additionally an implication about geographical distribution, or that the functions can be distributed in different physical locations. This is a benefit in that prevents failure in one part of the system from affecting another part.

The word Control implies the ability of the system to close the loop between an input measurement and a manipulated handle in the process. This means that the DCS shall have the capability for basic and advanced control algorithms.

The word System implies that all of the above is connected as one contiguous system i.e. in simple words, one comprehensive system with systems and physical parts spread over potentially a wide area carrying out monitoring and control functions.

A control system may have one or more PLCs (programmable Logic Controllers). The PLC is a term applied in different ways. In large process facilities, there is a requirement that there be two systems-one for control while another for safeguarding. The plant-wide safeguarding portion is typically done by a safety-certified PLC. However, smaller PLCs could be used in smaller single loop control and safeguarding applications as well.

PLC Simplified with limited logic control for like a machine or Simple process with limited interlock logic - progamme can be modified easily.This will give only indication of failure.No recording the event or process parameter ,with limited memory.Cost wise it is very cheap.

DCS concern Huge multiple logic controlls with  greater than 1000 of inter lock for process of power plant or refineries or any process Industries it will give all types of alarm in soft copy & hard copy about process , failure & record all the process input & out put parameters & efficiency if required .(Boiler,Turbine, Generator controlls Switch gear cotrolls ie power generation to Transmission.) Very Large memory back up, failuer rate very less,process parameter all are fixed cannot be changed by Individual. Troubleshooting very easy . Production will not be affected at all. 

 Fully integrated DCS System:   


 
  
              


The ADVANTAGES were greatly reduced wiring costs, much more limited failure and less cost to add more points.   The DISADVANTAGES were that wiring costs were that wiring costs were still significant and there was lack of interoperability among controllers of various manufacturers due to the proprietary protocols. Hence the user was locked into a single vendor.
Popular DCS Systems Available:
  • Yokogawa – Centum Excel  , CS 3000, CS 5000
  • Fisher - Rosemant - Delta V
  •  Honeywell - TDC 3000, GUS
  • ABB - Freelance 2000
  • Moore -  APACS
  • Fox boro - I/A series             
 

Read More..

Basic PLC Ladder Programming Example 14



Basic PLC Ladder Programming Training Example 14 : 24 Hour clock using Counter PLC Ladder Program 

Basic PLC Ladder Programming Training Examples for Beginners. Hi Friends here we are starting a series of Free Training on PLC Ladder Programming. These PLC Ladder Programs are important to get basics of Ladder Programs



PLC Ladder Practice Problem:



  •  Using 3 counters together with the flag of M1013 (1s clock pulse) to operate a 24-hour clock. 

Topics Covered in this example is use of Counter in PLC Program  

Number of PLC Counter Required 

C0 - count per second
C1- count per minute
C2 - count per hour 

Number of PLC internal memory flag Required

M1013 - 1s clock 

PLC Ladder Programming:




PLC Ladder Programming Description: 

.
  • The key of operating a 24-hour clock is to use M1013 (1s clock pulse). When the program is executed, C0 will count once per second. When the counted number reaches 60(1 minute), C0 = ON. C1 will count once, and C0 will be reset at the same time; similarly, when the counted number in C1 reaches 60(1 hour), C1 = ON. C2 will count once, and C1 will be reset at the same time. Furthermore, when the present value in C2 reaches 24, C2 will be reset, and the 24-hour counting process will start again.
  • The 24-hour clock operates by using C0 to count “second”, C1 to count “minute” and C2 to count “hour.” In this clock, the value of “second”, “minute” and “hour” can be read by C0, C1 and C2 correspondingly. When the set value of C2 is 12, the clock will be a 12-hour clock.  

See More Examples here


PLC Ladder Programming Example 1
PLC Ladder Programming Example 2
PLC Ladder Programming Example 3
PLC Ladder Programming Example 4
PLC Ladder Programming Example 5
PLC Ladder Programming Example 6
PLC Ladder Programming Example 7
PLC Ladder Programming Example 8
PLC Ladder Programming Example 9
PLC Ladder Programming Example 10
PLC Ladder Programming Example 11
PLC Ladder Programming Example 12
PLC Ladder Programming Example 13
PLC Ladder Programming Example 14
PLC Ladder Programming Example 15


    Read More..